Power Tools
Accessories
world leader in
cordless innovation
M125™ logo
M18™ Logo
MX FUEL™ logo
most versatile, durable
modular storage system
PACKOUT Modular Storage System
3780-20

M18 FUEL™ 3/8” Precision Nutrunner - 4-13 ft•lb

Share

This product is COMING SOON!

Sign up so we can let you know when it’s available.

Specs

Loading

Product Overview

Delivering Precision Torque Control, the M18 FUEL™ 3/8” Precision Nutrunner - 4-13 ft•lb enables users to fasten bolts with confidence, providing repeatability of Cm+Cmk > 1.67 at ±10% and expanding Milwaukee’s Solar Installation solutions. Powered by a POWERSTATE™ Brushless Motor, Milwaukee's Precision Nutrunner delivers faster installation speed, making users and sites the Most Productive during Utility-Scale Solar installation. With customizable ONE-KEY™ reporting, every trigger pull is recorded, and data can be downloaded for a verified install report. This allows the sites and groups who require reporting the ability to access fastening results wirelessly, and with ease. Additionally, ONE-KEY™ gives users and tool crib managers the power to customize, track, and manage the tool. Compatible with all M18™ REDLITHIUM™ batteries and chargers, the 3/8” Precision Nutrunner - 4-13 ft•lb is a part of a complete cordless system with over 300+ tools that are built to perform.

  • Precision Torque Control: Cm and Cmk > 1.67 (+/- 10% tolerance range).

  • Faster Installation Speed – more work done.

  • Verified Installs – customizable ONE-KEY™ reporting provides detailed installation data.

  • Red/Green On-Tool LEDs – clear visual indication of application success.

  • REDLINK PLUS™ Intelligence – Integrates full-circle communication between tool, battery and charger.

  • Secure Pin Detent Anvil – Securely locks socket in place while working.

  • M18™ REDLITHIUM™ System – complete cordless system with over 300+ tools.

  • Certificate of Calibration – Milwaukee® recommends re-certification occur no later than 12 months after the date it is put in service, but the Due Date & QA/QC processes shall be defined by the user.

Additional Resources

Explore the systems